Concept site prepared by Fresh Digital for Totally Outdoors. Not the live website.
Registered builder since 198652 Star Crescent, Hallam VIC 3803

Residential

Timber Deck Builders Melbourne

Workmanship10 year warranty
ExperienceOver 45 years
PermitsIncluded over 10m2
Lead time7 to 8 weeks

Overview

Timber Deck Builders Melbourne

At Totally Outdoors, we're proud to be Melbourne's leading specialists in timber and composite decking. With years of experience and hundreds of successful projects under our belt, we design, build, and support high-quality deck solutions tailored to suit your lifestyle and outdoor space.

Request a design consultation
Timber Deck Builders Melbourne

Key features

What you get

  • Transform your outdoor living, decks evolve from simple porches to entertainment zones
  • Compared to concrete or paving, decking may be a premium option, but it offers significant benefits
  • Composite decking has become an increasingly popular choice for homeowners seeking lower maintenance
  • Merbau remains Melbourne's most widely used timber decking material, and has been for over 50 years
  • 10-Year Registered Builders Workmanship Warranty
  • Over 45 Years' Experience in the home improvement industry
  • Building Permits and Architectural Plans included for decks over 10m2
  • Process typically takes 7 to 8 weeks from deposit to site start

Project photography

Recent work

Totally Outdoors project photographyTotally Outdoors project photographyTotally Outdoors project photographyTotally Outdoors project photographyTotally Outdoors project photographyTotally Outdoors project photography

How it works

Four stages, and we handle the council paperwork

Standard lead time is 10 to 12 weeks from deposit and stage payments received, through to installation commencement.

01

Plans prepared

Architectural plans for your structure, professionally drafted and ready for permit.

02

Permit applied for

We apply for the standard building permit through our partner The Project Centre, so you never deal with council.

03

Materials ordered

Materials ordered and delivered, colour matched to the finishes you have chosen.

04

Installed

Your install is scheduled and built by our team. Standard lead time is 10 to 12 weeks from deposit.

Manufacturer and builder warranties, as published by Totally Outdoors
Product or systemCoversTerm
Victory Home ImprovementsSteel and aluminium products30 years
Ultimate Louvre System, Louvre Master Pty LtdLouvre blades10 years
Ultimate Louvre System motorsMotors7 years
Bondor SolarSpan and ShademasterInsulated roofing panels10 years
Totally Outdoors, Registered BuilderStructural workmanship10 years
COLORBOND steelCorrosion, flaking and peelingSee COLORBOND
Ziptrak blindsTrack guided blinds2 years
HVG fabricsOutdoor blind fabrics10 years

All installations include building permits, public liability insurance, and home warranty insurance if required.

Before you build

Permits and timelines

Do I need a building permit for a verandah, patio or outdoor room?

In most cases, yes. Almost all structural roofed projects, including verandahs, patios, roofed pergolas and carports, require a building permit, and sometimes a planning permit depending on your local council overlays and planning scheme.

Permits are site specific. Location, size, height and visual impact on neighbouring properties all affect the requirement, and it should be checked against your Section 32 and any covenants on the property.

When is a pergola exempt from a building permit?

Under regulation a pergola is defined as an open, unroofed structure, though it may include permeable covering such as shade mesh or open slats. A pergola may be exempt if it meets all of the following:

  • Floor area less than 20m2
  • Height no more than 3.6 metres
  • Located no further forward than the front wall of the dwelling, or within 2.5m of that wall
  • The structure does not impose structural loads on the home

Even when permit exempt, a pergola must still be designed to safely resist applied loads and must not negatively affect any building it is attached to.

What is an owner builder, and should I become one?

An owner builder takes full legal and insurance responsibility for the project, as if they were the registered builder. It is sometimes suggested by unregistered contractors who cannot legally enter into building contracts over $10,000.

As an owner builder you are responsible for insurance, safety compliance, building code adherence and all legal liability for the structure. We strongly recommend seeking advice before accepting that role.

How long does a project take?

Standard lead time is 10 to 12 weeks from deposit and stage payments received, through to installation commencement. That covers preparation of plans, application for standard building permits, ordering and delivery of materials, and scheduling and commencement of installation.

Decking projects typically take 7 to 8 weeks from deposit to site start. Additional council or government applications, such as town planning, Report and Consent, and fire modifications, can add 5 to 14 weeks or more.

Every project starts with a conversation

Start your project

Tell us about your space

Send us the basics and one of our outdoor living specialists will come back to you with the right options for your home and budget.

We reply within one business day. Your details are used only to answer your enquiry.

Who we have worked with

RACVWestfieldHiltonVictoria State Government